Difference between revisions of "Similkameen Ore Conveyor Bridge"
(Created page with '<div style="font-size: 25px; text-align: center;"> Similkameen Ore Conveyor Bridge<br /> Princeton, British Columbia, Canada<br /> 570 feet high / 174 meters high<br /> 1,325 foo…') |
|||
Line 5: | Line 5: | ||
1,325 foot span / 404 meter span<br /> | 1,325 foot span / 404 meter span<br /> | ||
1980<br /> | 1980<br /> | ||
− | [[File: | + | [[File:3SimilkameenOreConveyor.jpg|1000px|center]] |
</div> | </div> | ||
Line 17: | Line 17: | ||
<div style="text-align: center; font-size: 25px;"> | <div style="text-align: center; font-size: 25px;"> | ||
− | [[File: | + | [[File:SimilkameenOreElevFinal.jpg|1000px|center]]<br /> |
− | + | Similkameen Ore Conveyor Bridge Elevation<br /> | |
</div> | </div> | ||
− | [[File: | + | [[File:1SimilkameenOreConveyor.jpg|1000px|center]] |
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:2SimilkameenOreConveyor.jpg|650px|center]] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:4Similkameen.jpg|650px|center]] |
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:5SimilkameenBridge.jpg|1000px|center]] |
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:6SimilkameenOreBridge.jpg|1000px|center]] |
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:7Similkameen.jpg|650px|center]] |
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:8SimilkameenConveyor.jpg|1000px|center]] |
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:9Similkameen.jpg|1000px|center]] |
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:10Similkameen.jpg|1000px|center]] |
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:11Similkameen.jpg|1000px|center]] |
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:12SimilkameenBridge.jpg|1000px|center]] |
Image by Eric Sakowski / HighestBridges.com | Image by Eric Sakowski / HighestBridges.com | ||
− | [[File: | + | [[File:13SimilkameenBridgesAerial.jpg|1000px|center]] |
− | + | Similkameen Ore Conveyor Bridge satellite view. | |
− | [[File: | + | [[File:13SimilkameenBridgesAerial.jpg|1000px|center]] |
− | + | Similkameen Ore Conveyor Bridge satellite view. | |
− | |||
− | [[Category:Bridges in | + | [[Category:Bridges in Canada]] |
− | [[Category:Bridges in | + | [[Category:Bridges in British Columbia, Canada]] |
Revision as of 02:30, 16 October 2009
Similkameen Ore Conveyor Bridge
Princeton, British Columbia, Canada
570 feet high / 174 meters high
1,325 foot span / 404 meter span
1980
The highest bridge ever built in Canada, the Similkameen Ore Conveyor bridge is actually the second of two high suspension bridges that were constructed to facilitate the massive Similco copper mining complex 10 miles (16 km) south of Princeton, British Columbia, Canada. The first crossing - a pipeline bridge for tailings, slurry and water - opened in 1972.
The second bridge - with a large conveyor across it - opened in 1980 to carry copper ore over to the west side of the river. As much as 1600 tons of ore per hour can cross the main span of 1,325 feet (404 mtr). The ore is then processed inside of a huge building before it is loaded onto trucks headed out to nearby highway 3. The taller, west bridge tower has two unusually large wind stay truss supports that jut out from its base. The long conveyor is partially covered by a series of odd-looking corrugated enclosures - each with two “windows” punched into the sides. Buckland & Taylor Ltd. designed the bridge in a joint venture with Robert McLellan & Co. Ltd.
The original pipeline bridge is located about half a mile (.8 km) north of the conveyor bridge and is of a similar design with a main span of 950 feet (290 mtrs). Costing just a million dollars, it was designed by Canadian Bechtel and constructed by the Dominion Bridge Company of Vancouver.
Image by Eric Sakowski / HighestBridges.com
Image by Eric Sakowski / HighestBridges.com
Image by Eric Sakowski / HighestBridges.com
Image by Eric Sakowski / HighestBridges.com
Image by Eric Sakowski / HighestBridges.com
Image by Eric Sakowski / HighestBridges.com
Image by Eric Sakowski / HighestBridges.com
Image by Eric Sakowski / HighestBridges.com
Image by Eric Sakowski / HighestBridges.com
Image by Eric Sakowski / HighestBridges.com
Image by Eric Sakowski / HighestBridges.com
Similkameen Ore Conveyor Bridge satellite view.
Similkameen Ore Conveyor Bridge satellite view.